edit · history · print

Universal node for electrical valves (32-8 EL)

Switches & ledís

  • First a yellow led : SERVICE-led. Lights up when you push the service-switch. When this led flashes or is lit continuously, a severe software problem occured in the node. ( call us )
  • Second a red led : RECEIVE-led
  • Third a red led : TRANSMIT-led
  • Bottom a green led : lights up when power supply is ok.

At the connector-side youíll find :

  • A push-button switch : SERVICE-switch. This transmits the ID-number of the node.
  • A resettable thermal fuse : when this pops out, a little white flag is visible. After removing the problem, such as short circuit, push it back in to reset.

Connection:

There are two identical 6-way connectors at the right of the node. The left one may be used for connecting nodes who need 12V power supply, max 800mA such as reader or weight controllers . MAXIMUM 3 NODES TO SUPPLY. The right one is to connect the major network.

pin 1+12V (output)
pin 2GND
pin 3NC
pin 4Network A
pin 5Earth ( shielding )
pin 6Network B

The 8 x 6-way connector used for the outputs. The output voltage is 24 Vac.

pin 1Dose 1
pin 2Dose 2
pin 3Dose 3
pin 4+12V Common
pin 5Output coil +24V
pin 6Output coil GND


Software

Within the neuron program you can influence the behaviour of the node by setting different flags

Flags:

  • MaxCount : maximum number of tap actions without resetting the input
  • Pause : time between two tap actions
  • Flags :
    • Between 1 and 8: maximum number of valves opened at the same time
    • 9: Handdouche (used for controlling berg douche systems)
    • 10: Speedrail: 2 different amounts on 1 button
  • Wait : time between double tap
edit · history · print
Page last modified on April 11, 2008, at 09:01 AM